期刊文献+

现浇箱梁整体顶升支座更换方法及计算分析 被引量:1

Replacement method and calculation analysis of integral jacking support of box girder
下载PDF
导出
摘要 文章依托某市东外环路跨河现浇箱梁安装错误支座型号作为工程实例,为更换误装支座减少社会负面影响目的,通过不同更换施工方法比选,采用整体顶升技术进行支座更换,通过模拟分析桥梁支座顶升各个工况的受力情况作为指导,同时更换过程中使用传感器监测梁体分级顶升位移,使主梁受力始终处于均衡状态,该项目支座更换技术的成功运用,说明了KPZ系列快装盆式支座方法的可行性,可作为市政、交通的桥梁支座维护管养施工参考。 Based on the example of box girder across the river on the East Outer Ring Road in a city,in order to reduce the negative social impact,through the selection of different replacement construction methods,the overall jacking replace technology was chosen.By analyzing the stress of each working condition of bearing jacking,at the same time,sensors are used to monitor the graded lifting displacement of the beam in the process of replacement,so that the main beam is always in a balanced state.The successful application of the bearing replacement technology shows the feasibility of the KPZ fast-loading pot bearing method,which can be used as a reference for the maintenance and management of bridge bearing.
作者 刘学强 LIU Xueqiang
出处 《福建建设科技》 2021年第3期77-80,共4页 Fujian Construction Science & Technology
关键词 整体顶升 支座更换 KPZ快装盆式支座 Integral jacking Bearing replacement KPZ fast-loading pot bearing
  • 相关文献

参考文献4

二级参考文献14

共引文献45

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部