摘要
铁路隧道施工建筑有着较强的技术性,对新技术也有着极大的应用需求。经过对我国铁路施工的情况进行了分析与研究后得知,若想完善铁路隧道施工的先进技术,就需对铁路隧道进行机械化平行流水施工,将施工工艺与技术有效结合,从而提高施工的效率。
The construction of railway tunnels is highly technical,and there is also a great demand for new technologies.After analyzing and researching the situation of railway construction in China,it is known that for the advanced technology of railway tunnel construction,it is necessary to carry out mechanized parallel flow construction of railway tunnels and effectively combine construction technology and technology,to improve construction efficiency.
出处
《建筑技术开发》
2021年第9期103-105,共3页
Building Technology Development
关键词
铁路隧道
机械化
平行流水施
railway tunnel
mechanization
parallel flowing water