摘要
地铁明挖车站属于目前地铁车站施工中常用的技术措施,但是部分工程施工期间还会出现风险问题。为探索出风险控制措施,分析张旺渠站地铁明挖车站的风险问题,提出几点应对的措施,旨在为地铁明挖车站施工工作的安全开展提供帮助。
Technical measures used in Xi'an Metro open-cut stations are currently commonly the construction of subway stations.However,risk problems may also occur during the construction of some projects.In order to explore risk control measures,the current Zhangwangqu station subway open-cut station risk issues are analyzed and several measures are put forward,which provides assistance for safe development of construction work of subway open-cut stations.
出处
《建筑技术开发》
2021年第9期115-116,共2页
Building Technology Development
关键词
西安地铁明挖车站
风险
控制措施
Xi'an Metro open-cut station
risk
control measure