期刊文献+

装配重力式混凝土护岸结构的设计及施工 被引量:12

Design and construction method of assembly gravity concrete bank revetment structure
下载PDF
导出
摘要 装配式建筑施工效率高、质量可靠,且符合国家提倡的绿色低碳、可持续的发展理念,是未来发展的方向。结合近年来我国现有装配重力式混凝土护岸结构工程实例,通过对结构选型、构件拆分、构件连接、模具组合、运输吊装等关键技术进行全面、系统的研究分析和提炼,形成成套技术。该技术可为装配重力式混凝土护岸结构的设计和施工提供安全可靠、经济适用、示范性强的方法。 The assembly building has high construction efficiency,reliable quality,and conforms to the green,low-carbon and sustainable development concept advocated by the country.Thus it is the direction of future development.This article combines the existing engineering examples of the assembly gravity concrete bank revetment structure in my country in recent years,and forms a complete set of technology through comprehensive and systematic research,analysis,and refinement of key technologies such as structure selection,component disassembly,component connection,mold assembly,transportation,and hoisting,etc.This technology can provide a safe,reliable,economical,and demonstrative method for the design and construction of the assembled gravity concrete bank revetment structure.
作者 顾宽海 汪涛 陈明阳 叶上扬 GU Kuan-hai;WANG Tao;CHEN Ming-yang;YE Shang-yang(CCCC Third Harbor Consultants Co.,Ltd.,Shanghai 200032,China;CCCC Third Harbor Engineering Co.,Ltd.,Shanghai 200032,China)
出处 《水运工程》 北大核心 2021年第6期6-12,19,共8页 Port & Waterway Engineering
关键词 装配式 重力式护岸结构 构件拆分 构件连接 assembly gravity bank revetment structure component disassembly component connection
  • 相关文献

参考文献4

二级参考文献51

共引文献105

同被引文献56

引证文献12

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部