EPC总承包单位项目建设过程投控管理模式研究

Research on Investment and Control Management Mode of EPC General Contractor in Project Construction Process
下载PDF
导出
摘要 为研究EPC总承包单位项目建设过程中投控管理模式,本文以广水卷烟厂“十三五”技改项目为例,从成本管控、质量管控、进度管控三个方面分别对项目投资控制进行分析,项目的成本管控、质量管控、进度管控是投资控制影响三大要素,密不可分,相互作用,充分对之研究讨论以期获得良好的投控管理研究价值,对项目成本管控有一定实用价值的指导。 In order to study the investment and control management mode of the EPC general contractor’s project construction process,this article takes the Guangshui Cigarette Factory’s"13th Five-Year"technical transformation project as an example,and invests in the project from three aspects:cost control,quality control,and schedule control.Control analysis,project cost control,quality control,and schedule control are the three major elements of investment control.They are inseparable and interact with each other.Fully study and discuss them in order to obtain good investment control management research value,which has practical value guidance for project cost control.
作者 王啸 张明玉 门梦飞 田志保 余虎 WANG Xiao;ZHANG Mingyu;MEN Mengfei;TIAN Zhibao;YU Hu(China Construction Third Bureau Installation Engineering Co.,Ltd.,Wuhan,Hubei Province,430000 China;Hubei China Tobacco Industry Co.,Ltd.,Guangshui Cigarette Factory,Suizhou,Hubei Province,432700 China;State Grid Hubei Electric Power Co.,Ltd.,Suizhou Power Supply Company,Suizhou,Hubei Province,441300 China)
出处 《科技创新导报》 2021年第3期133-135,共3页 Science and Technology Innovation Herald
关键词 EPC工程总承包 成本管控 质量管控 进度管控 EPC project general contracting Cost control Quality control Schedule control
  • 相关文献

参考文献4

二级参考文献7

共引文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部