软弱围岩隧道大变形的产生原因及控制 被引量:1

Causes and Control Measures of Large Deformation in Weak Surrounding Rock Tunnel
下载PDF
导出
摘要 软弱围岩在外力扰动下易变形,不利于隧道的安全施工,且易引发质量问题。论文结合关西隧道工程,探明该隧道发生变形的关键成因,在此基础上提出针对性的控制措施,包括对浅埋稀土采矿区围岩大变形的控制、斜井进正洞三岔口快速施工等,以达到保安全、提质量、增效益的效果,最终保证了工程的整体质量,可为相关项目提供参考。 The weak surrounding rock is easily deformed under the disturbance of external force,which is not conducive to the safe construction of the tunnel and is easy to cause quality problems.Combining with the Guanxi tunnel project,this paper explores the key causes of deformation of the tunnel,and then proposes targeted control measures,including the control of large deformation of surrounding rock in shallow-buried rare earth mining areas,the rapid construction of the fork road from inclined shaft to the main tunnel,etc.,so as to ensure safety,improve quality,and increase efficiency,and ultimately ensure the overall quality of the project,which can provide a reference for related projects.
作者 李达昌 宋俊洁 LI Da-chang;SONG Jun-jie(China Railway No.3 Engineering Group Co.Ltd.,Taiyuan 030001,China;Shanxi Daqin Logistics Co.Ltd.,Automobile Logistics Branch,Taiyuan 030600,China)
出处 《工程建设与设计》 2021年第10期66-68,共3页 Construction & Design for Engineering
关键词 隧道施工 软弱围岩 变形控制 tunnel construction weak surrounding rock deformation control
  • 相关文献

参考文献1

二级参考文献3

共引文献4

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部