摘要 针对广西大浦高速公路平田隧道穿越F2断层破碎带发生的涌水塌方事故,深入调查了事故发生的过程,并对涌水塌方机制进行了分析。在此基础上,提出了涌水塌方综合处治方案,通过方案的有效实施,掌子面涌水量及支护结构的变形量均得到有效控制。研究成果可供类似的隧道工程借鉴与参考。 The remediation of the highway tunnel excavation collapse induced by the groundwater gushing in the Pingtian Tunnel crossing an F2 faulted fracture zone in the Dapu Expressway project is introduced in this paper.Factors that caused the accident were evaluated and investigated in depth.The remediation plan was proposed based on the thorough investigations and was effectively implemented in the construction.Both the inflow of the groundwater into the excavated area and the deformations of the supporting structures were under the control.
作者 高抗 GAO Kang(CCCC Second Highway Consultants Co.Ltd.,Wuhan 430056)
出处 《土工基础》 2021年第2期124-129,共6页 Soil Engineering and Foundation
基金 中国交通建设股份有限公司2017年度特大科技研发项目(KJFZ-2017-073)。
关键词 隧道工程 断层破碎带 涌水 塌方 处治措施 tunnel excavations faulted fracture zone groundwater gushing tunnel collapse remediation plan
  • 相关文献

参考文献3

二级参考文献25

共引文献78

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部