摘要
随着建设工程项目的日益大规模化和管理精细化,现有工程量的计算及管理方法已经无法满足要求。如何选择最佳计算线路、优化计算程序以减少重复劳动、提高工程数量管理效率和准确性已经成为本领域技术人员迫切需要解决的技术难题。本文通过工程数量管理系统的研究应用,解决工程量计算易出错、参与人数多、组织协调困难、数据量大、算量表不统一、汇总难、提取数据慢等问题,可供类似建设项目工程数量管理借鉴。
With the increasing large-scale construction projects and the fine management,the existing calculation and management methods of engineering quantity can not meet the requirements.How to choose the best calculation circuit,optimize the calculation program to reduce repeated labor,and improve the efficiency and accuracy of engineering quantity management has become an urgent technical problem to be solved by technicians in this field.Through the research and application of the engineering quantity management system,this paper solves the problems such as the fallibility of the engineering quantity calculation,the large number of participants,the difficulty of organization and coordination,the large amount of data,the inconsistency of the calculation table,the difficulty of summing up,and the slow extraction of data,it can be used for reference in quantity management of similar construction projects.
作者
杨涛
YANG Tao(China Railway 16^(th) Bureau Group 4^(th) Engineering Co.Ltd.,Beijing 101400,China)
出处
《铁道建筑技术》
2021年第S01期315-319,共5页
Railway Construction Technology
基金
中铁十六局集团有限公司研发建设项目(K2019-11B)。
关键词
工程量
信息化
生产进度管理
项目WBS
engineering quantity
informatization
production schedule management
project WBS