摘要
解决好铁路客站与站前广场及交通设施的配套问题,是建设好铁路客站的关键技术之一,需要专题研究解决。结合现场发现的问题、社会媒体披露的问题和业内综合统计的问题,分区取样后进行对比研究,通过梳理65座铁路客站的站前广场及交通设施配套情况,从客流量匹配、接口设计、进站口布置、客流疏解和配套工程实施等5个方面展开分析,明确站前广场及交通设施配套功能要求的重点,提出探索站前广场及交通设施配套高质量发展的新路径。
Coordination of railway passenger station with station square and transportation facilities is one of the key technologies in building a railway passenger station,for which special research is necessary for a solution.Based on the problems identified on site,the problems disclosed by social media and the problems in the comprehensive industrial statistics,zoned sampling survey and comparative study are adopted and the coordination of 65 passenger stations with station square and transportation facilities is reviewed for analysis from five aspects,namely passenger flow volume matching,interface design,entrance layout,passenger flow relief and supporting facilities implementation;the key points are made clear,i.e.improving the basic functions and meeting the general requirements,and a new path to explore the high-quality development for the coordination with station square and transportation facilities is put forward.
作者
武赞
WU Zan(China Railway Economic and Planning Research Institute Co Ltd,Beijing 100038,China)
出处
《中国铁路》
2021年第6期57-62,共6页
China Railway
关键词
铁路客站
站前广场
交通设施
地铁
城市轨道交通
railway passenger station
station square
transportation facilities
the subway
urban rail transit