基于CMMI和PMBOK的IT项目管理探讨——以L公司为例

Discussion on IT Project Management Based on CMMI and PMBOK--A Case Study of L Corporation
下载PDF
导出
摘要 鉴于信息技术行业的独特性,IT项目管理与一般性项目管理存在较大差异,直接应用传统项目管理理论往往效果不佳。L公司将CMMI模型和PMBOK项目管理体系相结合,根据IT行业特点和企业IT产品特点,有针对性地开发了一种IT项目管理工程方法,应用效果明显,具有一定的借鉴意义。 In view of the uniqueness of information technology industry,IT project management is quite different from general project management;the direct application of traditional project management theory is often ineffective.L Corporation combines CMMI model with PMBOK project management system,and develops a practical IT project management engineering methods according to the characteristics of IT industry and IT products,which has certain reference significance.
作者 陈雷 邢宏珍 CHEN Lei;XING Hong-zhen(School of Economics and Management,Hubei University of Automotive Technology,Shiyan Hubei 442000,China;Hubei Industrial Polytechnic,Shiyan Hubei 442000,China)
出处 《河北软件职业技术学院学报》 2021年第2期65-70,80,共7页 Journal of Hebei Software Institute
关键词 CMMI PMBOK IT 项目管理 工程方法 CMMI PMBOK IT project management engineering method
  • 相关文献

参考文献2

二级参考文献3

  • 1[美]ProjectManagementInstitute.项目管理知识体系指南(PMBOK指南第5版)[M].北京:电子工业出版社,2013.46-61.
  • 2[美]肖(Shore,J.),活登(wlarden,S.).敏捷开发的艺术[M].南京:东南大学出版社,2008.26.38,431-439.
  • 3成虎,许叶林,李俊娜.对目前我国项目管理几个问题的思考[J].项目管理技术,2008(3):54-57. 被引量:5

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部