期刊文献+

基于BIM的钢桁梁桥裂纹病害信息数字化管理 被引量:6

Digital Management of Crack Defects Information in Steel Truss Bridges Based on Building Information Modeling
下载PDF
导出
摘要 为解决传统桥梁病害信息管理过程中数据采集过程复杂、可视化效果不佳及缺乏时间关联要素的问题,结合BIM(building information modeling)技术实现了某钢桁梁桥裂纹病害的可视化,基于可视化编程软件Dynamo研发了一种裂纹病害信息快速批量更新的方法,且将更新代码模块化;通过引入病害时间参数,创建了4D裂纹病害信息模型,实现了裂纹病害信息与三维图形在时间序列上的动态关联,呈现了裂纹的扩展规律.研究结果表明:在桥梁病害管理系统中引入BIM技术可以提升病害信息管理的效率,实现裂纹病害信息的可视化,通过4D裂纹病害信息模型的创建可以直观地对裂纹病害的发展历程加以呈现,帮助桥梁运维管理人员科学地预测裂纹发展趋势. In order to solve the problem of complex data collection process,poor visualization effect and lack of time-related factors in the traditional bridge defects information management process,the building information modeling(BIM)technology was used to realize the visualization of a steel truss bridge crack defect,and a method for rapid batch update of crack defects information was developed with the visual programming software Dynamo,in which the update code is modularized.By introducing time parameters of defects,a 4D crack defects information model was created,whereby the dynamic correlation between crack defect information and 3D graphics in time series was realized,and the crack propagation law was presented.Results show that the introduction of BIM technology into the bridge defects management system can improve the efficiency of defects information management and realize the visualization of crack defects information.The created 4D crack defects information model can intuitively present the development process of crack defects,facilitate bridge operation and maintenance,and help managers scientifically predict the trend of crack development.
作者 卫星 邹建豪 肖林 陈杨 古兴宇 WEI Xing;ZOU Jianhao;XIAO Lin;CHEN Yang;GU Xingyu(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;Hangjinqu Branch of Zhejiang Communications Investment Group Company,Hangzhou 310004,China)
出处 《西南交通大学学报》 EI CSCD 北大核心 2021年第3期461-468,492,共9页 Journal of Southwest Jiaotong University
基金 四川省科技计划高新技术及产业化面上项目(2017GZ0374)。
关键词 钢桁梁桥 裂纹 建筑信息模型 病害管理 时间参数 4D模型 steel truss bridge crack building information modeling(BIM) disease management time parameter 4D model
  • 相关文献

参考文献5

二级参考文献29

  • 1刘红勇,何维涛,黄秋爽.普通高等院校BIM实践教学路径探索[J].土木建筑工程信息技术,2013,5(5):98-101. 被引量:91
  • 2Huang T, Kong C W, Guo H L, Baldwin A, Li H. A virtual prototyping system for simulating construction processes [J]. Automation in Construction, 2007, 16( 5 ): 576-585.
  • 3Li H, Huang T, Kong C W, Guo H L, Baldwin A, Chan N, Wong J. Integrating design and construction through virttial prototyping[J]. Automation in Construction, 2008, 17 ( 8): 915-922.
  • 4Li H, GUO H L, Skibniewski M J, Skitmore M. Using the IKEA model and Virtual Prototyping technology to improve construction process management[J]. Construction Management and Economics, 2008, 26 ( 9 ): 991-1000.
  • 5Li H, Guo H L, Skitmore M, Huang T, Chan N, Chan G. Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong[J]. Construction Management and Economics, 2011, 29 ( 3 ): 233-245.
  • 6Guo H L, Li H, Skitmore M. Life cycle management of construction projects based on Virtual Prototyping technology[J]. Journal of Management in Engineering, ASCE, 2010, 26 (1): 41 47.
  • 7Guo H L, Li H, Chan G, Skitmore M. Using game technologies to improve the safety of construction plant operations[J]. Accident Analysis and Prevention, 2012, 48: 204-213.
  • 8汪时机,李贤,蒋运忠.《桥梁工程》课程教学存在的问题与对策[J].西南师范大学学报(自然科学版),2010,35(2):273-276. 被引量:33
  • 9李恒,郭红领,黄霆,陈镜源,陈景进.BIM在建设项目中应用模式研究[J].工程管理学报,2010,24(5):525-529. 被引量:156
  • 10张建平,张洋,张新.基于IFC的BIM三维几何建模及模型转换[J].土木建筑工程信息技术,2009,1(1):40-46. 被引量:64

共引文献184

同被引文献59

引证文献6

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部