期刊文献+

高速铁路拱塔斜拉桥拱塔轴线优化求解 被引量:5

Optimization on Axis of Arch-Shaped Pylon for High-Speed Railway Cable-Stayed Bridge
下载PDF
导出
摘要 为解决高速铁路斜拉桥以小角度跨越既有交通线路、河流等时塔墩布置难题,引入拱塔结构,并基于不动点迭代方法及有限元计算对拱塔轴线线形的优化求解问题进行了分析.在确定拱塔高度和跨度并拟定初始拱塔轴线的基础上,首先对拱塔结构进行受力平衡分析,建立拱塔线形优化非线性方程组;然后应用不动点迭代方法求解该非线性方程组,得到合理拱塔轴线的近似解,求解过程中通过有限元方法计算斜拉索的索力;最后以广汕铁路跨深汕高速拱塔斜拉桥为工程背景,分别优化得到恒载、恒载+单线列车竖向静活载、恒载+双线列车竖向静活载3种工况下合理拱塔轴线的近似解.结果表明:3种不同的荷载工况下,线形优化后的拱塔弯矩最不利值相对优化前弯矩降低89.8%~94.8%;主力、主力+附加力荷载组合下,拱塔弯矩降低幅度介于64.6%~92.2%,拱塔应力由-172.6~-179.5 MPa降低至-74.0~-6.2 MPa,拟合轴线下拱塔正负挠度分别降低51.0%、33.8%. In order to resolve the pylon layout difficulty for high speed railway cable-stayed bridges when the bridges span existing traffic lines,rivers and so on with small angles,the arch-shaped pylon was adopted and the optimization on axis of arch-shaped pylon was analyzed based on the fixed point iteration method and finite element analysis. Firstly, nonlinear equations for arch pylon optimization are established by analyzing the force balance of arch-shaped pylon based on that the height and span of the arch tower are determined and the initial axis is drawn up. Secondly, the non-linear equations are solved by the fixed point iteration method, and the approximate solution of the reasonable arch-shaped pylon axis is obtained,in which the cable-stayed cable force is calculated by the finite element method. Finally, taking the arch-shaped pylon cable-stayed bridge of Guangzhou–Shanwei High-Speed Railway spanning Shenzhen–Shantou Expressway as the engineering background,the approximate solutions of reasonable arch-shaped pylon axes are obtained under three typical load conditions,i.e.,dead load,dead load combined with single-track train vertical static live load,and dead load combined with double-track train vertical static live load. The results show that under the three different load conditions,using the optimized arch-shaped pylon axes can reduce bending moments of arch-shaped pylons by 89.8% to 94.8%,compared with using the initial arch-shaped pylon axis;under the main force or both the main force and additional force,bending moments of optimized arch-shaped pylons are reduced by 64.6% to 92.2%,stresses of arch-shaped pylons are reduced from-172.6 –-179.5 MPa to-74.0 –-6.2 MPa, and positive and negative deflections of optimized arch-shaped pylons with fitting axis are reduced by 51.0% and 33.8% respectively.
作者 施洲 胡豪 蒲黔辉 刘振标 印涛 SHI Zhou;HU Hao;PU Qianhui;LIU Zhenbiao;YIN Tao(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China)
出处 《西南交通大学学报》 EI CSCD 北大核心 2021年第3期469-476,共8页 Journal of Southwest Jiaotong University
基金 中国铁路总公司科技研究开发计划重大课题(2017G006-A)。
关键词 桥梁工程 拱塔斜拉桥 拱塔轴线 线形优化 不动点迭代方法 bridge engineering arch-shaped pylon cable-stayed bridge axis line of arch-shaped pylon alignment optimization fixed point iterative method
  • 相关文献

参考文献9

二级参考文献68

共引文献334

同被引文献46

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部