建筑工程后浇带提前封闭技术应用 被引量:3

Application of Advanced Sealing Technology in Post-pouring Zone of Construction Engineering
下载PDF
导出
摘要 一般施工过程中,主体建筑建成后,沉降基本完成后浇筑后浇带,这样可以有效避免沉降带来的损害。但实际施工过程中,后浇带施工会对工期造成不利影响,会和现场施工产生矛盾。结合实际案例,着重介绍地下室施工过程中后浇带提前封闭施工技术的应用。 In the general construction process,after the main building is completed,the settlement is basically completed and the post-pouring zone is poured,which can effectively avoid the damage caused by settlement.However,in the actual construction process,the post-poured band construction will cause adverse impact on the construction period,and will have contradictions with the field construction.Combined with the actual case,the application of the construction technology of the advanced sealing of the postpouring zone during the course of the basement construction is emphatically introduced.
作者 杨小军 Yang Xiao-jun
出处 《建筑技术开发》 2021年第10期108-109,共2页 Building Technology Development
关键词 后浇带 提前封闭 防水工艺 预制板 post-pouring zone advanced sealing waterproof process pre-cast slab
  • 相关文献

参考文献3

二级参考文献10

共引文献19

同被引文献9

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部