某水电站引水隧洞混凝土工程施工技术 被引量:4

Construction Technology of Concrete Engineering for Intake Tunnel of a Hydropower Station
下载PDF
导出
摘要 以某水电站引水隧洞衬砌施工为例,文章阐述了底拱采用针梁式台车、边顶拱采用钢模台车的组合施工方式的施工工艺和混凝土浇筑控制措施。该施工模式的应用可减少混凝土浇筑断面,使施工更为简便,并取得较好的成效,为在类似工程中的推广应用积累了宝贵的经验。 Taking the lining construction of intake tunnel of a hydropower station as an example,this paper expounds the construction technology and concrete pouring control measures of the combined construction mode of needle beam trolley for bottom arch and steel formwork trolley for side and top arch.The application of this construction mode can reduce the concrete pouring section,make the construction more simple,and achieve better results,which accumulates valuable experience for the popularization and application of similar projects.
作者 陈子银 王金平 岳耕 CHEN Ziyin;WANG Jinping;YUE Geng(Tangshan Branch of China Anneng Group First Engineering Bureau Co.,Ltd.,Tangshan,Hebei,063000)
出处 《红水河》 2021年第3期41-44,共4页 Hongshui River
关键词 引水隧洞 混凝土衬砌 混凝土浇筑 施工工艺 intake tunnel concrete lining concrete placing construction technology
  • 相关文献

参考文献3

共引文献1

同被引文献21

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部