某水电站大坝右岸灌浆平硐涌水处理施工技术

Water Surge Treatment Technology of Grouting Adit on Right Bank of a Hydropower Station Dam
下载PDF
导出
摘要 针对某水电站大坝右岸灌浆平硐在水库蓄水后出现的涌水问题,笔者分析了涌水发生的原因,揭示了岩层发育特征对灌浆平硐涌水的影响,并提出了应急抢险处理的基本思路、应急处理施工方法以及后期工程处理的原则和方法。监测结果表明,处理措施得当,实施效果良好,可为类似工程、类似情况提供参考和借鉴。 In view of the water surge problem of grouting adit on the right bank of a hydropower station after reservoir impoundment,the author analyzes the causes of water surge,reveals the influence of rock stratum development characteristics on the water surge of grouting adit,and puts forward the basic ideas,construction methods of emergency treatment and the principles and methods of later engineering treatment.The monitoring results show that the treatment measures are appropriate and the implementation effect is good,which can provide reference and reference for similar projects and similar situations.
作者 毛泽魁 彭新建 王亚新 MAO Zekui;PENG Xinjian;WANG Yaxin(China Anneng Group First Engineering Bureau Co.,Ltd.,Nanning,Guangxi,530000)
出处 《红水河》 2021年第3期48-51,共4页 Hongshui River
关键词 灌浆平硐 涌水 施工技术 应急处理 大坝 水电站 grouting adit water surge construction technology emergency handling dam hydropower station
  • 相关文献

参考文献5

二级参考文献6

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部