论建设工程项目管理中全过程工程造价控制 被引量:4

Discussion on the Whole Process Engineering Cost Control in Construction Project Management
下载PDF
导出
摘要 工程造价与工程建设阶段的工作相互适应相辅相成,但是总体上分为几个阶段,每个工程建设施工阶段都有不同的功造价控制关键要点,每个环节都会对最终的工程造价造成一定的影响,例如在建筑工程中底价、承包合同、竣工验收等环节都与造价息息相关。在现阶段的施工当中,大部分工程项目都比较重视施工图纸的审核、结算部分,但是忽视了前期对投资、设计阶段造价的控制。 The project cost and the work of the project construction phase are mutually adapted and complementary,but generally divided into several stages.Each project construction phase has different key points of power cost control,and each link will have a certain impact on the final project cost.For example,in construction projects,the base price,contracting,and completion acceptance are all closely related to the cost of construction.In the current stage of construction,most engineering projects pay more attention to the review and settlement of construction drawings,but ignore the early control of investment and design costs.
作者 孟炀子 MENG Yang-zi(Xi'an Shiyou University,Xi'an 710065,China)
机构地区 西安石油大学
出处 《价值工程》 2021年第15期60-61,共2页 Value Engineering
关键词 建设项目 工程 全过程管理 造价控制 construction project engineering whole process management cost control
  • 相关文献

参考文献3

二级参考文献6

共引文献32

同被引文献34

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部