摘要 对婺源站跨场运行时,因移频轨道电路区段长度不足而导致动车制动问题进行深入分析,提出将移频轨道电路的发码时机与列车运行方向关联,使该区段的轨道电路有条件发码的特殊处理方案,巧用继电电路的小修改解决列控系统问题,避免列控软件修改,节约问题解决的时间及成本,该思路值得后续解决类似问题参考借鉴。 The case of abnormal EMU train braking during cross-yard operation due to insufficient length of the frequency-shifted track circuit section in Wuyuan Railway Station is analyzed.A solution is proposed to link the timing of code transmission in the frequency-shifted track circuits with the direction of train movement and to make the track circuit section send code information based on conditions.A creative modification scheme of the control relay circuit is introduced to solve the problem of abnormal EMU train braking,avoiding the modification of the train control center software and saving construction period and cost.It can provide significant reference for related problems.
作者 陈建强 Chen Jianqiang(China Railway SiYuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China)
出处 《铁路通信信号工程技术》 2021年第6期88-91,99,共5页 Railway Signalling & Communication Engineering
基金 中铁第四勘察设计院集团有限公司科研项目(2020K068)。
关键词 列控系统 轨道电路 低频信息 非正常制动 有条件发码 train control system track circuit low-frequency information abnormal braking conditional code sending
  • 相关文献

参考文献6

二级参考文献15

  • 1TB/T3060-2002.机车信号信息定义及分配.[S].铁道部,2002.
  • 2铁道科学研究院.既有线提速200km/h技术条件.北京:中国铁道出版社,2006.
  • 3铁道部科技司.CTCS技术规范总则(暂行).北京:中国铁道出版社,2004.
  • 4铁道部运输局.既有线200km/h铁路车站列控中心运用技术原则(暂行).北京:中国铁道出版社,2005.
  • 5铁道部科技司.既有线CTCS-2级列控系统车站列控中心技术规范(暂行).北京:中国铁道出版社,2007.
  • 6CTCS.2级列车运行控制系统维护管理规则(暂行)[S].TG/DWl05-2007运基信号[2007]105号.
  • 7TB10216-2009.客运专线铁路信号工厂室外设备安装规程[S].铁建设[2009]72号.
  • 8客运专线铁路信号工程施工质量验收暂行标准[S].铁建设[2007]213号.
  • 9既有线CTCS-2级列车运行控制系统技术规范(暂行)[S].科技运[2007]43号.
  • 10中华人民共和国铁道部.科技运[2008]127.CTCS-3级列控系统系统需求规范(SRS)[S].2008.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部