摘要 随着矿体开采,形成的采空区容易造成片帮、冒顶、岩爆、冲击地压及空气冲击波、地面塌陷、地面沉降、地裂缝以及由其导致的滑坡、泥石流等多种形式灾害的发生。经过多次方案对比,敦德铁矿采用了最经济又简便安全的采空区封闭的处理方法,选用溜井封堵、斜坡道封堵、巷道封堵三种封堵方案对采空区进行治理。 With the mining of ore body,the goaf formed is prone to the occurrence of many kinds of disasters,such as the slope,roof falling,rock burst,impact ground pressure and air shock wave,ground collapse,ground settlement,ground crack and landslides and debris flow caused by it.After many schemes comparison,the most economical and safe method of goaf closure is adopted in Dunde Iron Mine,and three sealing schemes,namely,chute plugging,ramp sealing and roadway sealing,are adopted to control the goaf.
作者 白霖武 苏静明 陈欢 BAI Lin-wu;SU Jing-ming;CHEN Huan(Bazhou Dunde Mining Co.,Ltd.)
出处 《新疆钢铁》 2021年第1期47-49,共3页 Xinjiang Iron and Steel
关键词 采空区 溜井封堵 巷道封堵 斜坡道封堵 goaf chute plugging roadway plugging ramp road blocking
  • 相关文献

参考文献2

二级参考文献3

共引文献6

同被引文献24

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部