连云港港30万吨级航道疏浚工程施工难点及控制措施 被引量:2

Construction difficulties and control measures of 300000 tons waterway dredging project in Lianyungang Port
下载PDF
导出
摘要 以连云港港30万吨级航道二期工程为例,面对航道里程长、土质难挖、气象复杂等施工难点,提出了较为全面的控制措施,可使疏浚船舶发挥较高的挖泥效率,有效控制成本,安全顺利地完成工程任务,并总结了一套技术经验,可为后续工程或同类型项目提供借鉴和示范。 Taking the second phase of the 300000 tons waterway project of Lianyungang Port as an example,aiming at the construction difficulties such as long channel length,difficult soil excavate,and complicated weather,we proposed more comprehensive control measures to enable dredging ships to exert higher dredging efficiency,effectively control costs,complete engineering tasks safely and smoothly,and summarized a set of technical experience,which can provide better reference and demonstration for follow-up projects or similar projects.
作者 廖宏刚 朱淋淋 LIAO Hong-gang;ZHU Lin-lin(CCCC Dredging(Group)Co.,Ltd.,Shanghai 200082,China;CCCC Guangzhou Dredging Co.,Ltd.,Guangzhou,Guangdong 510290,China)
出处 《中国港湾建设》 2021年第6期68-71,共4页 China Harbour Engineering
关键词 连云港港 30万吨级航道 疏浚工程 施工难点 控制措施 Lianyungang Port 300000 tons waterway dredging project construction difficulties control measures
  • 相关文献

参考文献5

二级参考文献16

  • 1中交上海航道勘察设计研究院有限公司.连云港港30万吨级航道工程预可行性研究报告及专题研究报告[R].上海:中交上海航道勘察设计研究院有限公司,2008.
  • 2连云港港口总体规划(批复稿)[R].连云港:连云港市人民政府,2008.
  • 3连云港港徐圩港区总体规划(报批稿)[R].连云港:连云港市人民政府,2010.
  • 4中交上海航道勘察设计研究院有限公司.连云港港30万吨级航道一期工程工程可行性研究报告专题研究报告[R].上海:中交上海航道勘察设计研究院有限公司,2009.
  • 5连云港港30万吨级航道一期工程(H1.1标段)岩土工程勘察报告[R].南京:江苏省水文地质工程地质勘察院,2010.
  • 6新海豚轮连云港港30万吨级航道先导试挖工程疏浚工程H1.1标段生产效率调研测试报告[R].上海:中交上海航道局有限公司东方疏浚工程分公司,2011.
  • 7疏浚技术培训教材[M].上海:中交上海航道局有限公司,2005.
  • 8董江,王胜平.GPS PPK远距离在航潮位测量及其在航道的实现[J].测绘通报,2008(5):51-53. 被引量:12
  • 9解鸣晓,张玮,张庭荣.淤泥质海岸泥沙运动模拟及进港航道大风天回淤特性研究[J].应用基础与工程科学学报,2010,18(2):262-272. 被引量:12
  • 10张立强,刘远程.远距离潮位控制在莱州港5万吨级航道疏浚工程中的应用[J].科技资讯,2012,10(25):46-46. 被引量:3

共引文献7

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部