摘要
以连云港港30万吨级航道二期工程为例,面对航道里程长、土质难挖、气象复杂等施工难点,提出了较为全面的控制措施,可使疏浚船舶发挥较高的挖泥效率,有效控制成本,安全顺利地完成工程任务,并总结了一套技术经验,可为后续工程或同类型项目提供借鉴和示范。
Taking the second phase of the 300000 tons waterway project of Lianyungang Port as an example,aiming at the construction difficulties such as long channel length,difficult soil excavate,and complicated weather,we proposed more comprehensive control measures to enable dredging ships to exert higher dredging efficiency,effectively control costs,complete engineering tasks safely and smoothly,and summarized a set of technical experience,which can provide better reference and demonstration for follow-up projects or similar projects.