副井受损承台加固技术研究

Study on reinforcement technology of damaged auxiliary shaft cap
下载PDF
导出
摘要 为了解决副井长期使用引起的地层沉降,进而导致副井承台承载能力降低并危及副井正常运行安全的问题,本文以某矿山副井承台受损破坏为工程背景,采用理论分析和现场工程实践相结合的方法,提出一套考虑承台和基础共同加固的技术方法,制定具体的实施方案,并应用在实际工程中。结果表明:副井承台加固后,其承载力和桩侧土压力等静力指标显著提高。 In order to solve the problem of strata subsidence caused by long-term use of auxiliary shaft,which leads to the reduction of bearing capacity of auxiliary shaft cap and endangers the normal operation and safety of auxiliary shaft.In this paper,based on the damage of auxiliary shaft cap in a mine,a set of technical methods considering the joint reinforcement of cap and foundation is put forward by combining theoretical analysis with field engineering practice,and a specific implementation scheme is formulated and applied in the actual engineering.The results show that the load-bearing capacity and the soil pressure at the side of the pile are significantly improved after the auxiliary shaft cap is strengthened.
作者 曲炳强 梁鹏亮 原野 于世波 QU Bingqiang;LIANG Pengliang;YUAN Ye;YU Shibo(Sanshandao Gold Mine,Shangdong Gold(Laizhou)Group Co.,Ltd.,Laizhou 261442,China;Faculty of Land Resources Engineering,Kunming University of Science and Technology,Kunming 650093,China;BGRIMM Technology Group,Beijing 100160,China;School of Civil and Resource Engineering,University of Science and Technology Beijing,Beijing 100083,China)
出处 《中国矿业》 2021年第S01期382-384,共3页 China Mining Magazine
关键词 副井承台 加固 承载力 注浆 during pile caps strengthening bearing capacity grouting
  • 相关文献

参考文献3

二级参考文献29

共引文献55

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部