摘要
以上海某SPF级动物房为例,介绍了该动物房的建筑概况及空调系统负荷特点。详细分析了采用新排风热管显热回收及冷却除湿热回收两大节能措施后的全年运行能耗、初投资、全年减少的运行费用及投资回收期。结果表明,同时采用2项节能技术的投资回收期为1 a,经济效益显著。
Taking a SPF(specific pathogen free)animal house in Shanghai as an example,presents the general situation and the load characteristics of the air conditioning system of the animal house.Analyses the annual operation energy consumption,initial investment,reduced operation cost and investment recovery period after adopting the two energy saving measures of sensible heat recovery of outdoor and exhaust air heat pipe and cooling dehumidification heat recovery in detail.The results show that the investment payback period of using two energy saving technologies at the same time is 1 year,and the economic benefit is remarkable.
作者
任尔媛
Ren Eryuan(Shanghai Xian Dai Architecture Engineering&Consulting Co.,Ltd,Shanghai,China)
出处
《暖通空调》
2021年第6期71-74,共4页
Heating Ventilating & Air Conditioning
关键词
SPF级动物房
空调负荷
热管显热回收
冷却除湿热回收
经济效益
SPF animal house
air conditioning load
sensible heat recovery of heat pipe
cooling dehumidification heat recovery
economic benefit