EPR首堆机组调试监督及经验浅谈 被引量:2

Commissioning Supervision and Experience Feedback of First EPR Reactor Unit
下载PDF
导出
摘要 根据三代堆型EPR机组的特点,调试监督人员采用不同的监督检查方式,对EPR首堆机组——台山核电厂1号机组的调试全过程进行了审评监督和现场见证,保质保量地完成调试监督任务。在日常核安全检查的基础上,调试监督人员对EPR首堆开展了6次调试相关的控制点检查,并选取78项调试试验进行专项监督,其中首堆试验17项,确保了重要调试试验得到过程监督和结果见证。本文从调试监督项目选取、审评监督一体化机制、严格先决条件审查和高风险试验严格管控等9个方面对EPR首堆的调试监督经验进行了总结,形成了可借鉴的监督经验和模式,同时对EPR首堆机组后续运行提出了监督意见和建议。 According to the characteristics of EPR units,commissioning inspectors adopt various supervision and inspection methods to review,supervise and witness the whole process of commissioning of Taishan nuclear power plant unit 1,which is the EPR first reactor unit.The task of commissioning supervision was completed with high quality and quantity.On the basis of daily nuclear safety inspection,commissioning inspectors carried out six hold point inspections of commissioning of EPR first reactor,and selected 78 commissioning tests for special supervision,including 17 first reactor tests,to ensure that important commissioning tests are supervised in process and witnessed in results.This paper summarizes the commissioning supervision experience of EPR first reactor from nine aspects,such as the selection of commissioning supervision items,the integration mechanism of review and supervision,the strict review of preconditions,and the strict control of high-risk tests,forming the supervision experience and mode that can be refer for another new type rector.Finally,the supervision opinions and suggestions for the subsequent operation of EPR first reactor unit were proposed.
作者 项建英 王进 杨凯 孙振宇 Xiang Jianying;Wang Jin;Yang Kai;Sun Zhenyu(South China Regional Office,MEE,Shenzhen 518034,China)
出处 《核安全》 2021年第3期1-6,共6页 Nuclear Safety
关键词 EPR机组 调试监督 核安全检查 监督经验 EPR reactor unit commissioning supervision nuclear safety inspection experience feedback
  • 相关文献

参考文献4

二级参考文献21

  • 1司恒远.EPR核电厂安全分级体系简介[J].核标准计量与质量,2013(1):7-16. 被引量:5
  • 2Ficher M.The severe accident mitigation concept and the design measures for core melt retention of the European Pressurized Reactor (EPR) [J].Nuclear Engineering and Design, 2004, (230) : 169-180.
  • 3Teichel H.How the European Pressurised Water Reactor fuels the utility requirements[J].Nuclear Engineering and Design, 1999, (187):9-13.
  • 4Gillen K T.Lifetime predictions of EPR materials using the Wear-out approach[J].Polymer Degradation and stability, 2006, (91) :3197-3207.
  • 5Puma A L.Optimization of a water-cooled divertor for the Euro pean power plant conceptual study[J].Fusion Engineering and Design, 2002, ( 61-62 ) : 177-183.
  • 6耿文行,赵月扬.法国CP1-CP2系列核电机组安全重要设备分级的经验反馈[J].核安全,2007,6(1):42-48. 被引量:8
  • 7国家核安全局.核动力厂设计安全规定[S]北京:国家核安全局,2004.
  • 8国际原子能机构(IAEA).核动力厂安全[S]奥地利:国际原子能机构(IAEA),2005.
  • 9EUR Utilities. EUROPE ANUTILITY REQUIREMENTS FOR LWR NUCLEAR POWER PLANTS (EUR),Volume 2[S].EUR Utilities,2001.
  • 10台山核电合营有限公司.台山核电厂1、2号机组最终安全分析报告[M]台山:台山核电台营有限公司,2013.

共引文献10

同被引文献16

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部