摘要
文章结合厦门市国贸璟原项目工程实例进行探讨。前期对项目新建造体系进行了详细策划,过程中通过对施工方的技术交底,大面积施工前的样板先行、点评和优化,在大面积施工时的标准化落地,最终实现本项目提前达预售条件,提前封顶,提前回款,减轻了项目开发的成本压力。
This article summarizes the engineering example of Guomao Jingyuan project in Xiamen City.It is necessary to conduct detailed planning for the new construction system of the project.In the process,the technology was disclosed to the construction party,the templet was deliberated and optimized before large-scale construction,and standardization was implemented during large-scale construction.Finally,the project reached the pre-sale conditions ahead of schedule,capped ahead of time,Payment in advance,reducing the project development cost pressure.
作者
谢正德
XIE Zhengde(ITG Real Estate Group Co.,Ltd,Xiamen 361016)
出处
《福建建筑》
2021年第6期99-102,共4页
Fujian Architecture & Construction
关键词
新建造体系
策划
实践
落地
New construction system
Planning
Practice
Implementation