针对电气化铁路低净空跨线桥下接触网不能正常通过的情况,提出了一种用于多支承力索下锚的特殊硬横跨结构,对该结构的受力情况进行了有限元仿真分析,并通过实际工程验证了该结构的可靠性。
A special portal structure for anchoring of multiple messenger wires is proposed with regard to that the OCS of electrified railway is unable to negotiate through the overpass bridge with low clearance.The finite element simulation and analysis is used for analysis of the structure stress,and the reliability of the structure is verified in the actual projects.
作者
杨康
武帅
YANG Kang;WU Shuai
出处
《电气化铁道》
2021年第3期30-32,共3页
Electric Railway
关键词
低净空
接触网
硬横跨
仿真分析
low clearance
OCS
portal structure