摘要
介绍了板石矿业有限责任公司上青矿6#矿组加强井巷贯通施工管理,对实现矿山井下安全开拓的重要意义,对加强矿山井下开拓有较好的指导作用。
This paper introduces the significance of strengthened construction management of shaft and roadway link-up in the 6#mine group of Shangqing Mine of Banshi Mining Co.,for the realization of underground mine safety development,and it has a good guiding role in strengthening underground mine development.
作者
丁成伟
张俊
汪海涛
庄培新
DING Chengwei;ZHANG Jun;WANG Haitao;ZHUANG Peixin(Banshi Mining Co., Ltd, Baishan 230000, China)
出处
《矿业工程》
CAS
2021年第3期68-71,共4页
Mining Engineering
关键词
安全生产
施工技术
现场施工管理
井巷贯通误差预计
safe production
construction technology
site construction management
prediction of errors in shaft link-up