期刊文献+

C3/MRC天然气液化工艺优化模拟 被引量:7

Optimization and simulation of C3/MRC natural gas liquefaction process
下载PDF
导出
摘要 为降低天然气液化中丙烷预冷混合冷剂液化工艺(C3/MRC)的能耗,采用Aspen HYSYS软件建立了优化计算模型。结合KBO法和优化器中的Box算法,以系统最小能耗为目标函数,换热器最小换热温差3℃为约束条件,工艺参数和制冷剂配比为决策变量,对C3/MRC流程进行了优化模拟。结果显示,优化后单位质量天然气的液化能耗为351.49 kW·h/t,与国外经典的C3/MRC液化流程相比,能耗显著降低。 In order to reduce the energy consumption of propane-mixed refrigerant cycle process(C3/MRC)in the natural gas liquefaction,the optimization calculation model of C3/MRC was established by using Aspen HYSYS software.Combining the KBO method and the Box algorithm in the optimizer,with the minimum energy consumption as the objective function,the minimum temperature difference of the heat exchanger(3℃)as the constraint condition,and the process parameters and refrigerant ratio as decision variables,the C3/MRC process was optimized and simulated.The results show that the liquefaction energy consumption per unit mass of natural gas after optimization is 351.49 kW·h/t,which is significantly lower than the foreign classical C3/MRC liquefaction process reported in the literature.
作者 肖荣鸽 靳帅帅 王栋 庄琦 鱼红平 XIAO Rong-ge;JIN Shuai-shuai;WANG Dong;ZHUANG Qi;YU Hong-ping(Shaanxi Key Laboratory of Advanced Stimulation Technology for Oil&Gas Reservoirs,College of Petroleum Engineering,Xi'an Shiyou University,Xi'an 710065,Shaanxi,China;Oil Production Plant 2 of PetroChina Changqing Oilfield Company,Qingyang 745100,Gansu,China)
出处 《天然气化工—C1化学与化工》 CAS 北大核心 2021年第3期100-106,共7页 Natural Gas Chemical Industry
基金 西安市科技计划高校人才服务企业项目(2019217914GXRC015CG016-GXYD15.2)。
关键词 天然气液化 C3/MRC工艺 KBO法 Box算法 Aspen HYSYS natural gas liquefaction C3/MRC process KBO method Box algorithm Aspen HYSYS
  • 相关文献

参考文献9

二级参考文献52

  • 1赵敏,厉彦忠.C3/MRC液化流程中原料气成分及制冷剂组分匹配[J].化工学报,2009,60(S1):50-57. 被引量:17
  • 2曹文胜,吴集迎,鲁雪生,林文胜,顾安忠.撬装型混合制冷剂液化天然气流程的热力学分析[J].化工学报,2008,59(S2):53-59. 被引量:11
  • 3石玉美,汪荣顺,顾安忠,鲁雪生.流程参数对丙烷预冷混合制冷剂循环损失的影响[J].上海交通大学学报,2004,38(10):1703-1706. 被引量:8
  • 4牛亚楠,冯良.化工过程模拟软件在液化天然气工程中的应用[J].上海煤气,2007(1):5-8. 被引量:2
  • 5Wolfgang Foerg, Wilfried Bach et al. A new LNG baseload and the manufacturing of the main heat exchangers.Twelfth international Conference & Exhibition on Liquefied Natural Gas, Perth, Australia, 1998-02-06
  • 6Johnson G L, Finn A J et al. Offshore & smaller-scale liquefiers. LNG Journal, 1999;Jul/Aug:19-22
  • 7Vink K J. Comparison of baseload liquefaction process.Twelfth international Conference & Exhibition on Liquefied Natural Gas, Perch, Australia, 1998-03-06
  • 8Yoshitugi Kikkawa, Moritaka Nakamura. Development of liquefaction process for natural gas. Journal of Chemical Engineering of Japan, 1997;30(4):626-630
  • 9Yoshitsugi Kikkawa,Yu-Nan Liu.Zero CO2 Emission for LNG Power Chain?PS5-3.1,the 13th International Conference & Exhibition on Liquefied Natural Gas,Seoul,Korea,May 14~17,2001.
  • 10Cas Groothuis,Dave Fletcher,Rob Klein Nagelvoort,Changing the LNG Game.PS5-2.1,the 13th International Conference & Exhibition on Liquefied Natural Gas,Seoul,Korea,May 14-17,2001.

共引文献68

同被引文献71

引证文献7

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部