摘要
依据《GB 50156—2012(2014年版)汽车加油加气站设计与施工规范》和中国石化销售企业的有关规定,简要介绍了一至三级加油站建设规模的等级划分和精品、标准、基本、简易4类加油站建设的划分标准,指出了加油站建设项目具有审批手续繁多,办理周期较长;项目规模虽小,但涉及专业较多;建设质量要求高,施工安全风险大的特点,比较详细地叙述了加油站建设从项目前期、项目定义、项目实施、项目竣工与试运营、项目后评价5个阶段全生命周期管理模式的内容,分析了影响加油站建设项目工期的因素,提出了加快加油站建设项目投营的措施,为高质量建设加油站提供了基础。
According to the national standard"Code for design and construction of filling station(GB 50156-2012,2014 Edition)"and the relevant regulations of SINOPEC sales enterprises,the grade division of the construction scale of the first to third level gas stations and the division standards of the construction of the four types of gas stations,namely,high-quality,standard,basic and simple,are briefly introduced.It is pointed out that the construction of gas station project has many examination and approval procedures,long processing period,small project scale,but involving many specialties,high construction quality requirements and construction safety risks.The contents of life cycle management mode of gas station construction are described in detail from five stages of project prophase,project definition,project implementation,project completion and trial production,and post evaluation,the factors influencing the construction period of gas station construction project are analyzed,and some measures to speed up the investment of gas station construction project are put forward,so as to provide a basis for high-quality construction of gas station.
作者
王全明
焦维衡
Wang Quanming;Jiao Weiheng
出处
《石油库与加油站》
2021年第3期41-44,M0004,共5页
Oil Depot And Gas Station
关键词
加油站
建设
项目
全生命
周期
管理
模式
gas station
construction
project
whole life
cycle
management
mode