水电总公司东溪水库电站是县域范围内最大的电站,它筹建于1978年,1986年12月投入运行。随着工程运行年限的增加,以及水库电站技术设备的老化,开展电站技术改造势在必行。文章结合东溪水库电站技术改造的实际情况,对电站技术改造的相关实践内容进行了概括总结,为其他相似的水库电站进行技术改造实践提供相应的经验和方法参考。
Dongxi reservoir power station is the largest power station in the county.It was built in 1978 and put into operation in December 1986.With the increase of the project operation years and the aging of the technical equipment of the reservoir power station,it is necessary to carry out the technical transformation of the power station.Combined with the actual situation of technical transformation of Dongxi reservoir power station,this paper summarizes the relevant practice content of technical transformation of power station,and provides corresponding experience and method reference for other similar reservoir power stations.
作者
董硕
DONG Shuo(Wuyishan Dongxi Reservoir Operation and Control Center,Wuyishan 354300,China)
出处
《价值工程》
2021年第16期147-148,共2页
Value Engineering
关键词
东溪水库电站
技术改造
综合项目
Dongxi reservoir power station
technical transformation
integrated project