摘要
为了解决某煤矿建(构)筑物下压煤问题,结合开采现状、煤层赋存地质条件、生产技术条件及地面建筑物情况分析,通过理论计算、概率积分法对其条带开采方案进行设计,并对其进行经济效益分析,验证其可行性。结果表明,重点保护建(构)筑物控制变形等级采后维修方案,在技术与经济效益上可行,对今后煤层开采具有指导意义。
In order to solve the problem of the coal pressing under buildings(structures)in a certain coal mine,combining with the current mining situation,the geological conditions of the coal seam,the production technical conditions and the analysis of the ground buildings,the strip mining plan was designed based on the theoretical calculations and the probability integral method.Economic benefit analysis was carried out and the feasibility was verified.Results showed that the maintenance plan after mining for key protected buildings(structures)with control deformation levels was feasible in terms of technical and economic benefit,and had the guiding significance for the future coal seam mining.
作者
卫颖哲
张丽霞
Wei Yingzhe;Zhang Lixia(CCTEG Ecological Environment Technology Co.,Ltd.,Beijing 100013,China;CCTEG Tangshan Research Institute,Tangshan 063012,China)
出处
《矿山测量》
2021年第3期40-44,共5页
Mine Surveying
基金
国家重点研发计划资助项目(2016YFC0501105)。
关键词
建(构)筑物压煤
条带开采
地表移动变形计算
经济效益分析
coal pressing under buildings(structures)
strip mining
surface movement and deformation calculation
economic benefit analysis