大型敞开式TBM组装洞室布置及吊装方案比选 被引量:2

Layout and Hoisting Scheme Comparison of Large Open-type TBM Assembly Cavern
下载PDF
导出
摘要 随着长大山岭隧洞工程建设的不断发展,长大山岭隧道/洞敞开式TBM施工技术应用前景广阔。大型敞开式TBM洞内组装方案需结合工程地形地貌、工程布置和组装洞室条件进行优选。在建设工期压力下,对组装洞室布置及吊装方式进行研究比选,选择最优组装方案,以满足项目工程建设的需要。 With the continuous development of long-distance mountain tunnel construction,open-type TBM construction technology has broad application prospects.The assembly scheme of large open-type TBM tunnel needs to be optimized in combination with engineering topography and landform,engineering layout and assembly chamber conditions.Under the pressure of construction period,this paper studies and compares the arrangement and hoisting method of assembly chamber,and selects the optimum assembly scheme to meet the needs of project construction.
作者 李世民 徐建华 LI Shi-ming;XU Jian-hua(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2021年第6期99-102,共4页 Yunnan Water Power
关键词 大型敞开式 TBM 组装洞室 吊装 large open-type TBM assembly cavern hoisting
  • 相关文献

参考文献7

二级参考文献38

共引文献30

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部