摘要 斜井隧洞多采用有轨运输,如何合理安排材料运输与隧洞出渣的关系,是提高斜井运输效率的关键。蔡家村3号支洞为斜井支洞,主要承担其控制段主洞4182m的施工任务,该支洞斜井段主要采用提升机有轨运输。主洞施工期间施工任务繁重,工期紧张,地下车场交叉作业较多,且工程地质条件复杂。结合地下车场施工,分析地下车场施工布置、功能布置,尽可能的保证地下车场运行效率以及安全稳定,总结了斜井有轨运输地下车场布置的关键要点。 Most inclined shaft tunnels use rail transportation.How to arrange the relationship between material transportation and slag discharge is the key to improve the efficiency of inclined shaft transportation.Caijiacun No.3 branch tunnel is inclined shaft branch tunnel,which mainly undertakes the construction task of 4182m main tunnel in its control section.The inclined shaft section of this branch tunnel is mainly transported by hoist on rails.During the construction of main tunnel,the construction task is heavy and the construction period is tense.There are many cross-operations in underground garage,and the engineering geological conditions are complicated.Combining with the construction of underground car park,the construction layout and function layout of underground car park are analyzed to ensure the operation efficiency and safety and stability of underground car park as far as possible,and the key points of underground car park layout for inclined shaft rail transportation are summarized.
作者 廖健都 王陈涛 肖云伟 赵太东 LIAO Jian-du;WANG Chen-tao;XIAO Yun-wei;ZHAO Tai-dong(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2021年第6期133-137,共5页 Yunnan Water Power
关键词 斜井 有轨运输 地下车场 滇中引水 inclined shaft rail transport underground parking yard Yunnan Water Diversion Project
  • 相关文献

参考文献5

二级参考文献7

共引文献14

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部