摘要
开采煤炭时,当经过小窑破坏区时,周围岩层的稳定性比较差,常常会发生采区顶板下落和离层的现象,这对后续的支护与掘进工作造成了一定的影响,加大了矿井的开采难度。下面将对A矿5号煤层穿越小窑破坏区掘进技术进行简要阐述,以期为日后相关工作顺利进行提供参考。
The stability of the surrounding rock formations is relatively poor when passing through the destructive area of small kiln during mining,and the roof falling and separation of the mining area often occur,which has a certain impact on the subsequent support and tunneling work,and increases the difficulty of mining in the mine.This paper made a brief description of the tunneling technology for passing through destructive area in small kiln of No.5 coal seam in A Mine,which provide a reference for the smooth progress of related work in the future.
作者
戴振光
DAI Zhenguang(Sanjusheng Coal Industry Co.,Ltd.,Shanxi Coal Transportation&Sales Group,Loufan 030303,Shanxi,China)
出处
《能源与节能》
2021年第6期122-123,共2页
Energy and Energy Conservation
关键词
小窑破坏区
掘进技术
巷道支护
巷道布置
destructive area of small kiln
tunneling technology
roadway support
roadway layout