期刊文献+

排烟高位收水冷却塔设计

Design of Natural Draft Cooling Tower with Water Collecting Devices and Flue Gas Discharge
下载PDF
导出
摘要 本文介绍了排烟高位收水冷却塔探索过程。结合庐江神皖合肥庐江发电厂工程介绍了排烟高位收水冷却塔的斜支柱布置、玻璃钢烟道筒壁支持体系、中央竖井及烟道支架结构及排烟高位收水冷却塔防腐设计。 This article introduces the exploration process of the natural draft cooling tower with water collecting devices and flue gas discharge.Combined with lujiang shenwan power plant project in hefei,this paper introduces the arrangement of the inclined pillars,the support system of the glass fiber reinforced plastic flue wall,the central shaft and the flue support structure,and the anti-corrosion design of the high-level water absorption and exhaust cooling tower.
作者 牛楠 陈良 王宝福 NIU Nan;CHEN Liang;WANG Bao-fu(North China Power Engineering Co.,Ltd.of CPECC,Beijing 100120,China)
出处 《电力勘测设计》 2021年第S01期61-65,共5页 Electric Power Survey & Design
关键词 排烟高位收水冷却塔 斜支柱非均匀布置 烟道筒壁支持体系 中央竖井及烟道支架 high-level water absorption and exhaust cooling tower non-uniform arrangement of inclined pillars flue tube wall support system central shaft and flue support
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部