初步设计概算超可研投资估算原因研究 被引量:1

Study on the Reasons for Over-research Investment Estimation in Preliminary Design Estimates
下载PDF
导出
摘要 随着市场经济的快速发展,政府投资项目的数量及规模日益增大,建设项目投资超标的现象也不断增加。政府投资项目超出前期估算费用,不仅会增加额外的政府花销,还会降低政府的投资效益,影响政府的自身形象,造成很大的损失。在审批投资的过程中,需要对项目设计方案及项目投资进行评估,通过评估分析,规避问题、尽可能优化控制。文章从项目建设的实施过程出发,客观地分析了导致政府投资天然气项目超标的多种原因,并提出了相应的对策。 With the rapid development of the market economy,the number of government-invested projects is increasing day by day,and the phenomenon of over-investment in construction projects is also increasing.The advanced estimation cost of government-invested projects will not only increase additional government expenditure,also can cause the very big loss,reduces the government’s investment benefit,affects the government’s own image.In the process of investment examination and approval,it is necessary to evaluate the design scheme and project investment.Based on the implementation process of the project,this paper objectively analyzes the causes of overstandard of the government-invested natural gas project,and puts forward the corresponding countermeasures.
作者 张艳莉 ZHANG Yan-li(Shaanxi Gas Design Institute Co.,Ltd.,Xi'an 710043,China)
出处 《化工管理》 2021年第18期59-60,共2页 Chemical Engineering Management
关键词 天然气 可行性 项目投资 解决措施 natural gas feasibility project investment solutions
  • 相关文献

共引文献3

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部