期刊文献+

多目标双边装配线平衡问题改善研究 被引量:2

Study on Improvement of Balance for Multi-objective Two-sided Assembly Line
下载PDF
导出
摘要 第二类多目标双边装配线问题由于其复杂性,目前研究文献较少。为解决这一问题,在建立二维数学模型的基础上,提出改进和声搜索算法和非支配排序遗传算法相结合的一种混合算法,通过即兴创作过程进行全局搜索,变邻域搜索结构(插入和重组)进行局部搜索。对于E型作业,通过左右工位最早可开始时间进行动态对比选择最早的工位,尽量减少等待时间。采用NSGA-2的非支配排序和拥挤度计算,从而解决多目标的优化问题。最后选取实例进行求解分析,得出其最优的生产节拍和平滑系数以及作业在各工位的分布情况,从而验证了算法的有效性。 Due to its complexity,there are few literatures about multi-objective two-sided assembly line problem of type-2.To solve this problem,based on the two-dimensional mathematical model,an improved combination of the harmony search algorithm and the non-dominated sorting genetic algorithm was proposed,which performed a global search through the improvisation process and a local search through variable neighborhood search structure(insertion and recombination).For E-type work,the earliest start time of the left and right work stations could be used for dynamic comparison to select the earliest work station,and the waiting time was minimized.The non-dominated sorting and congestion degree calculation of NSGA-2 was used to solve the multi-objective optimization problem.Finally,an example was selected to solve,and the optimal production cycle and smoothness coefficient and the distribution of the tasks at each station are obtained,which verifies the effectiveness of the hybrid algorithm.
作者 黄辉 江超 任璇 周祥 HUANG Hui;JIANG Chao;REN Xuan;ZHOU Xiang(School of Management,Northwestern Polytechnical University,Xi′an 710129,China)
出处 《机械科学与技术》 CSCD 北大核心 2021年第6期900-907,共8页 Mechanical Science and Technology for Aerospace Engineering
基金 中央高校基本科研业务费专项资金项目(3102019BZ03)。
关键词 双边装配线 第二类平衡问题 多目标优化 和声搜索 NSGA-2 变邻域搜索 two-sided assembly line second balance model harmony search NSGA-2 variable neighborhood search
  • 相关文献

参考文献5

二级参考文献40

  • 1吴尔飞,金烨,汪峥.双边装配线第二类平衡问题研究[J].计算机集成制造系统,2005,11(11):1604-1608. 被引量:17
  • 2吴尔飞,金烨,续爱民,胡小锋.基于改进遗传算法的双边装配线平衡[J].计算机集成制造系统,2007,13(2):268-274. 被引量:18
  • 3张则强,程文明,钟斌,王金诺.求解装配线平衡问题的一种改进蚁群算法[J].计算机集成制造系统,2007,13(8):1632-1638. 被引量:36
  • 4KIM Y K, KIM Y, KIM Y J. Two-sided assembly line balancing: a genetic algorithm approach[J]. Production Planning &-Control, 2000, 11(1): 44-53.
  • 5LEE T O, KIM Y, KIM Y K. Two-sided assembly line balancing to maximize work relatedness and slackness[J]. Computers & Industrial Engineering, 2001, 40(3): 273-292.
  • 6AGRAWAL P K. The related activity concept in assembly line balancing[J]. International Journal of Production Research,1985, 23(2): 403-421.
  • 7BAYBARS I. A survey of exact algorithms for the simple assembly line balancing problem [J]. Management Science,1986, 32(8): 909-932.
  • 8SCHOLL A, BECKER C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing [EB/OL]. http://www. wiwi. uni- jena. de/Entscheidung/alb/SALBP- Survey. pdf, 2004- 06 - 26.
  • 9BARTHODI J J. Balancing two-sided assembly lines: a case study[J]. International Journal of Production Research, 1993,31(10) : 2447-2461.
  • 10J J.Barthodi^alancing two-sided assembly lines: a case study [ J ] .Interna-tional Journal of Production Research,1993,31(10): 2447-2461.

共引文献40

同被引文献14

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部