摘要 核电厂环吊的可靠性直接影响核电厂运行的经济效益,因此提出一种基于FMEA的环吊缺陷原因分析方法。结合秦山核电厂某次大修伊始环吊无法启动的分析和消缺过程,分析和验证了FMEA缺陷原因分析方法的有效性,同时对环吊控制系统提出优化和改进措施。该方法还能帮助维修人员快速定位缺陷,为核电厂其他重要设备的维修提供借鉴。 The reliability of ring crane in nuclear power plant directly affects the economic benefit of the operation of nuclear power plant.Therefore,a method based on FMEA to analyze the cause of ring crane defects is proposed.Combined with the analysis and defect elimination process of the ring crane failing to start at the beginning of an overhaul in Qinshan Nuclear Power Plant,the effectiveness of the FMEA defect cause analysis method is analyzed and verified.At the same time,optimization and improvement measures are proposed for the ring crane control system.The method can also help maintenance personnel to locate defects quickly and provide reference for maintenance of other important equipment in nuclear power plant.
作者 洪琪旭 武干 刘争光 黄贵鑫 宋学佳 HONG Qixu;WU Gan;LIU Zhengguang;HUANG Guixin;SONG Xuejia(China National Nuclear Power Operation Management Co.,Ltd.,Jiaxing 314300,China)
出处 《电工技术》 2021年第11期126-128,132,共4页 Electric Engineering
关键词 FMEA 环吊 控制系统 缺陷机理分析 FMEA ring sling control system defect mechanism analysis
  • 相关文献

参考文献6

二级参考文献14

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部