期刊文献+

盾构管片壁后注浆密实度地质雷达正演模拟与实例分析 被引量:1

Forward Modeling and Measured Data Analysis of Grouting Compactness Behind Shield Pipe Segment Wall
下载PDF
导出
摘要 根据盾构工法隧道的施工工艺及结构类型,利用GPRMAX3.0软件建立管片壁后存在有不同类型注浆缺陷的3D盾构隧道地质模型,运用有限差分方法正演模拟其缺陷的反射特征,再与实际管片注浆地质雷达检测结果对比分析。结果表明:管片背后注浆不密实区域形状及体积的大小会有不同的反射特征。GPRMAX正演的结果特征与实际地质雷达检测图像较为一致,通过模型正演模拟地质雷达在盾构隧道检测结果是可行的,可以为地质雷达在盾构隧道检测结果的解释提供一定的指导作用。 According to the construction technology and structure type of shield tunnel,using Gprmax3.0 software establish 3 D geological model of shield tunnel with different types of grouting defects behind segment wall,the finite difference method is used to simulate the reflection characteristics of defects,comparative analysis of the results of geological radar detection with actual segment grouting.The results show that:the shape and volume of the non-dense grouting area behind the pipe slice will have different reflection characteristics,the results of GPRMax forward modeling are consistent with the actual geological radar detection images,it is feasible to simulate the detection result of GPR in shield tunnel by model forward modeling,it can provide some guidance for the interpretation of the detection results of the geological radar in the shield tunnel.
作者 徐小勇 李学聪 刘书铭 XU Xiaoyong;LI Xuecong;LIU Shuming(Beijing Huan’an Engineering Inspection&Test Co.,Ltd.,Beijing 100101,China)
出处 《工程质量》 2021年第6期42-44,50,共4页 Construction Quality
关键词 盾构隧道 地质雷达 GPRMax 正演 shield tunnel ground penetrating radar GPRMax forward modeling
  • 相关文献

参考文献6

二级参考文献96

共引文献295

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部