摘要
以华阳集团矿区110 kV变电站GIS改造后运行情况为出发点,结合GIS设备工况特点,指出了在110 kV变电站GIS设备运行过程中需重点监控的环节,以实现安全运行的收益最大化。实践证明,该110 kV变电站GIS改造后的运行效果良好,满足了电网安全运行的需求,提高了电网设备的可靠性。
Starting from the operation conditions of 110 kV substation GIS in Huayang Group mining area after GIS transformation,combined with the characteristics of GIS equipment,the key monitoring links in the operation process of 110 kV substation GIS equipment is discussed so as to maximize the benefits of safe operation.Practice has proved that the operation effect of the 110 kV substation after GIS transformation is good,which meets the needs of safe operation of power grid and improves the reliability of power grid equipment.
作者
王维涛
WANG Weitao(Shanxi Huayang GroupPower Supply Branch,Yangquan 045000,China)
出处
《电工技术》
2021年第9期103-104,108,共3页
Electric Engineering
关键词
矿区
GIS设备
改造
mining area
GIS equipment
transformation