摘要
本文以调整工程项目建设施工过程中,预应力施工技术的相关应用展开分析和研究,结合我国某地区一处桥梁工程项目建设中案例,对预应力技术在应用过程中的相关工艺流程、使用问题,以及控制工作要点进行全面阐述,以期为类似桥梁工程项目建设施工提供参考和借鉴。
In this paper in order to adjust the construction process of the project construction,the application of prestressed construction technology is analyzed and studied,combined with a bridge project construction case in a certain area of China,the relevant technological process and application problems of prestressed technology in the application process are analyzed,and the main points of the control work are fully explained,in order to provide reference for the construction of similar bridge projects.