同忻矿8^(#)层顶抽巷光面爆破施工技术探讨

Discussion on Smooth Blasting Construction Technology of Top Drainage Roadway of No.8 Coal Seam in Tongxin Mine
下载PDF
导出
摘要 同忻矿C8^(#)层北一盘区8105工作面顶抽巷钻爆法掘进巷道时存在的巷道成型与茬进问题,通过运用光面爆破漏斗理论,研究实施了实时层节理光面爆破,现场实践表明,同忻矿C8#层北一盘区8105面顶抽巷的茬进由原来的2 m提高到2.5 m,日均进由3 m提高到4 m。 Due to the problems of roadway formation and footage when drilling and blasting method is used in 8105 working face of North No.1 panel of No.8 coal seam of Carboniferous System in Tongxin coal mine,the real-time smooth blasting method of joint is implemented by using smooth blasting funnel theory.The field practice shows that the footage of 8105 working face of North No.1 panel of No.8 coal seam of Carboniferous System in Tongxin coal mine is increased from 2m to 2.5m,The average daily footage is increased from 3 meters to 4 meters.
作者 王文栋 马占新 Wang Wendong;Ma Zhanxin(Jinneng Holding Coal Industry Group Co.,Ltd.,Datong Shanxi 037003)
出处 《同煤科技》 2021年第3期30-33,共4页 Datong Coal Science & Technology
关键词 岩巷 光面爆破 层节理 快速掘进 Rock-gateway Smooth blasting joint High-speed drivage
  • 相关文献

参考文献1

二级参考文献2

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部