浅谈砂卵石地层洞桩法施工中机械成孔桩坍塌处理技术 被引量:1

Discussion on Collapse Treatment Technology of Mechanical Pore-forming Piles during Cavern-Pile Method Construction in Sand Pebble Layer
下载PDF
导出
摘要 北京地铁19号线牛街站,为4导洞PBA洞桩法暗挖车站,围护桩采用洞内机械成孔桩施工工艺,文章阐述了车站周边环境及砂卵石地层、孔口坍塌情况,分析了孔口坍塌原因,提出了机械成孔桩施工过程中坍塌处理措施,为类似工程施工提供借鉴。 Niujie Station of Beijing Subway Line No.19 belongs to 4 pilot tunnel PBA cavern-pile method underground excavation station.Mechanical pore-forming pile construction technology in the hole is adopted for fender piles.The surrounding environment of the station,sandy pebble stratum and the orifice collapse situation are described in the paper.The reason of the orifice collapse is analyzed.The mechanical pore-forming pile collapse treatment measures in the construction process are proposed,thereby providing reference for similar projects.
作者 高银斌 GAO Yinbin(China Railway 18th Bureau Group Municipal Engineering Co.,Ltd.,Beijing 100053,China)
出处 《中国水能及电气化》 2021年第6期14-19,共6页 China Water Power & Electrification
关键词 机械成孔桩 坍塌处理 措施 mechanical pore-forming pile collapse treatment measures
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部