摘要 为研究既有地铁新增换乘通道开挖对周边结构影响,在模拟换乘通道的开挖过程时,考虑到该过程分为竖井的开挖、竖井通道的开挖及换乘通道的开挖,选用ANSYS软件分别对各个工序进行数值模拟,从横向和纵向分别分析换乘通道开挖到不同时间段时的施工过程对既有地铁结构与轨道的影响,得出其变形的规律,为换乘通道开挖提供变形控制标准。结果表明:换乘通道开挖会扰动既有地铁的车站、出入口及区间结构与轨道结构的受力状态,导致地铁结构及轨道产生竖向变形和横向变形。既有地铁结构、轨道结构的最大竖向变形值和横向变形值在允许范围之内,满足风险等级要求。 In order to study the influence of the excavation of the new transfer channel on the surrounding structure of the existing subway,when simulating the excavation process of the transfer channel,considering that the process is divided into shaft excavation,shaft channel excavation and transfer channel excavation,the ANSYS software was selected to simulate each process,and the influence of the construction process on the existing subway structure and track was analyzed horizontally and vertically.The law of its deformation was obtained,which provided the deformation control standard for the excavation of transfer channel.The results show that the excavation of the transfer passage will disturb the stress state of the existing subway station,entrance and section structure and track structure,resulting in vertical and lateral deformation of the subway structure and track.The maximum vertical and lateral deformation value of the existing structure is within the allowable range,which meets the risk grade requirements.
作者 张君 ZHANG Jun(The 18th Bureau Group Co. Ltd. of China Railway,Tianjin 300222, China)
出处 《国防交通工程与技术》 2021年第4期20-24,共5页 Traffic Engineering and Technology for National Defence
基金 中国铁建股份有限公司国家重点研发计划子课题(2018YFC0808700)。
关键词 换乘隧道 既有地铁 既有轨道 开挖 竖向变形 横向变形 transfer tunnel existing subway existing track excavation vertical deformation lateral deformation
  • 相关文献

参考文献6

二级参考文献53

共引文献82

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部