摘要
针对当前变电站建设管理方法存在的诸多问题,提出结合三维数字化设计技术,研究变电站建设管理方法。通过建立变电站建设项目协同管理模型、基于三维数字化设计技术的变电站建设运维管控、变电站建设数据集成与设备信息维护,提出一种全新的管理方法。实验证明,新的管理方法在实际应用中能够为变电站建设提供便利条件,促进建设效率提升。
In view of many problems existing in the current substation construction management method,this paper proposes to study the substation construction management method combined with three-dimensional digital design technology.Through the establishment of collaborative management model of substation construction project,operation and maintenance management of substation construction based on 3D digital design technology,data integration and equipment information maintenance of substation construction,a new management method is proposed.Experiments show that the new management method in practical application can provide convenient conditions for substation construction and promote the construction efficiency.
作者
潘海毅
李阔
王毅
PAN Haiyi;LI Kuo;WANG Yi(Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.,Guangzhou 510000,China)
出处
《电声技术》
2021年第4期48-51,共4页
Audio Engineering
关键词
三维
数字化
变电站
three-dimensional
digitization
substation