5Shishiba R. Implementation of a safety instrumented system[ C]//SICE Annual Conference 2007,Society of Instrument and Control Engineers, 2007:2493-2496.
6Goble W M, Cheddie H. Safety instrumented systems verification: practical probabilistic calculations [ M ]. ISA,2005:28-343.
7Boresok J, Schaefer P S, Ugljesa E. Estimation and evaluation of common cause failures [ C ]//Second International Conference on Systems, Proceedings of the Second International Conference, 2007 : 1-41.
9英国石油公司(British Petroleum,BP),Statistical Review of World Energy 2015 [EB/OL]. http://www.bp.com/en/ global/corporate/energy -economics/statistical -review -of - world-energy.html.
10Calculation of the current rating of electric cables,part 1 :current rating equations (100% load factor) and cal- culation of losses, section l:general:IEC 60287-1-h 1994[S]. 1994.