大型低温储罐罐顶气吹顶升施工新工艺 被引量:2

New Construction Technology in Large-scale Cryogenic Storage Tank Roof Air Lifting
下载PDF
导出
摘要 大型低温储罐工程施工中,罐顶气吹顶升作业是整个工程施工的难点和安全管控重点。针对以往施工方案复杂、措施用料多、施工准备周期长等状况,结合多年实践,对罐顶气吹顶升工艺进行了改进,特别是对平衡系统和密封系统进行了优化,取得了很好的应用效果。 In the construction of largescale cryogenic storage tanks,the air lifting operation of tank roof is the difficulty and key point in construction and safety management.Aiming at the previous problems of complex construction schemes,much materials used for improvement measures,and long construction preparation period,some improvements are made to the tank roof air lifting technology combining with years of practice,especially the balancing system and sealing system have been optimized.And good application effects have been achieved.
作者 肖然 Xiao Ran(SINOPEC Fourth Construction Co.,Ltd.,Tianjin,300270)
出处 《石油化工设备技术》 CAS 2021年第4期6-10,I0001,共6页 Petrochemical Equipment Technology
关键词 大型低温储罐 罐顶气吹顶升 新工艺 平衡系统 密封系统 优化 large-scale cryogenic storage tank tank roof air lifting new technology balancing system sealing system optimization
  • 相关文献

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部