铁路既有线大跨度框架顶进施工时线路加固技术 被引量:1

Line Reinforcement Technology during Jacking Construction of Large-span Frame on Existing Railway Line
下载PDF
导出
摘要 在下穿铁路双线大跨度框架斜交顶进时,因施工条件困难,常规扣轨纵横梁法加固线路无法满足施工要求。经详细勘察现场和技术创新,科学制定线路加固方案,采取D型施工便梁+孔桩支墩对线路进行两阶段加固,顺利完成本项目的顶进施工,确保了广大铁路的安全运营。 When under-crossing the railway double-track long-span frame skew jacking,due to the difficult construction conditions,the conventional buckle-track vertical and horizontal beam method cannot meet the construction requirements.After detailed site survey and technological innovation,the route reinforcement plan was scientifically formulated,and the D-shaped construction beam+hole pile buttress was adopted to strengthen the line in two stages.The jacking construction of this project was successfully completed,which ensured the safe operation of Guangda Railway.
作者 闫伯菲 YAN Bo-fei(China Railway 25th Bureau Group Co.,Ltd.,Guangzhou 511458,China)
出处 《价值工程》 2021年第18期132-134,共3页 Value Engineering
关键词 广大铁路 顶进法 施工便梁 线路加固 分阶段 Guangda Railway jacking method construction temporary beam line reinforcement phased
  • 相关文献

二级参考文献12

共引文献8

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部