摘要
220 kV内桥接线变电站作为终端变,通常不配置线路保护,靠对侧电源端线路保护切除故障。如果是主变低压侧区内故障,在高压侧开关失灵情况下,对侧保护距离Ⅱ段或Ⅲ段动作,这样主变承受故障电流时间增长。为了实现全线速动,某变电站一回220 kV线路增设双套线路保护。同时为了减小线路开关失灵时短路电流对主变的冲击,线路开关配置失灵保护。在线路保护改造过程中遇到了互感器选型、开关保护选型和操作箱选型等问题,文中给出了处理方案。
Usually there is not transmission line relay disposition at a 220kV internal bridge wiring terminal substation.It depends on transmission line protection at the opposite side substation.When a ground fault occurs on low-voltage side,if high-voltage side switch refuses to open,it depends on backup distance protection at the opposite side substation.To improve fast-trip performance and protection the main transformer,two transmission line relays are added at a 220kV substation.Current transformer and voltage transformer selection,failure protection relay selection and operation box selection problems are discussed in this paper.
作者
张鹏
ZHANG Peng(Xuzhou Survey and Design Center of State Power Economic Research Institute,Xuzhou,Jiangsu Province,221005 China)
出处
《科技资讯》
2021年第10期54-56,85,共4页
Science & Technology Information
关键词
内桥接线
线路保护
复合变比
失灵保护
分相操作箱
Internal bridge wiring
Transmission line relay
Compound transformation ratio
Breaker failure protection