护岸结构施工缝的设置方法 被引量:2

Setting Method of Construction Joint of Revetment Structure
下载PDF
导出
摘要 结合上海南新泾泵闸工程外河护岸2施工实际,将护岸结构施工缝从传统的设置在上部导梁与墙身之间的水平缝,改进为设置在上部导梁与墙身之间的竖向缝。分析了新旧施工缝设置形式存在的不足及处理方式,介绍了新型施工缝在工程中的应用情况,并对新旧施工缝设置形式进行比较分析,为同类型护岸结构的施工提供了借鉴。 Combined with the construction practice of revetment 2 of outer river of Shanghai Nanxinjing pump sluice project,the construction joint of revetment structure is improved from the traditional horizontal joint to the vertical joint between upper guide beam and wall body.The shortcomings and treatment methods of the new and old construction joint setting forms are analyzed,the application of the new construction joint in the project is introduced,and the new and old construction joint setting forms are compared and analyzed,which provides a reference for the construction of the same type of revetment structure.
作者 倪磊 NI Lei(Shanghai Hydraulic Engineering Group Co.,Ltd.,Shanghai 201612,China)
出处 《建筑施工》 2021年第6期1105-1107,共3页 Building Construction
关键词 护岸施工 施工缝 实际应用 比较分析 revetment construction construction joint practical application comparative analysis
  • 相关文献

参考文献4

二级参考文献7

共引文献20

同被引文献4

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部