期刊文献+

供电一体化综合调度方法研究

Research on integrated dispatching method of mine power supply
下载PDF
导出
摘要 由于传统方法电力传送链不完善,导致矿山供电调度方法网络延迟过久,研究矿山供电一体化综合调度方法。提取矿山供电整体特征,发现矿山供电极易出现节点故障问题,构建动态分布电力传送链模型,调节节点数量,控制电力系统运行,一体化算法综合调度矿山供电。实验结果:与传统方法相比,本文方法在网络延迟时间上比传统方法减少了1.0466s,由此可见,本文调度方法更加优秀。 Due to the imperfection of power transmission chain in traditional method,the network delay of mine power supply dispatching method is too long.By extracting the overall characteristics of mine power supply,it is found that the mine power supply is prone to node failure.A dynamic distributed power transmission chain model is constructed to adjust the number of nodes,control the operation of power system,and dispatch mine power supply with integrated algorithm.Experimental results:compared with the traditional method,the network delay time of this method is reduced by 1.0466s,which shows that this scheduling method is better.
作者 王景香 WANG Jing-xiang(Gansu water resources and Hydropower Survey,design and Research Institute Co.,Ltd,Lanzhou 730000,China)
出处 《世界有色金属》 2021年第10期163-164,共2页 World Nonferrous Metals
关键词 矿山供电 一体化 调度方法 动态分布 mine power supply integration scheduling method dynamic distribution
  • 相关文献

参考文献2

二级参考文献25

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部