摘要
在现阶段的机电工程建设中,工程成本精细化控制管理的难度较高,而且在建造信息管理的融合上,需按照可靠性、可行性的标准来完善,对潜在性的问题进行预判与处理,不断优化管理方案。再者,对成本方面的风险因素必须要准确识别,要最大限度开展成本管理工作。
At the present stage,it is not easy to control and manage the engineering cost of mechanical and electrical engineering construction.Moreover,the integration of construction information management needs to be improved according to the standards of reliability and feasibility,so as to better solve the potential problems and optimize the management scheme.On the other hand,the cost of risk factors must be accurately identified,and cost management must be maximized to give more evidence.